In Belgium, a non-residential building whose heating or air conditioning exceeds 290 kW must have a building automation and control system (BACS). The rule is regional: it has applied in Brussels since 1 January 2025, and in Wallonia and Flanders since 31 December 2025. Flanders will lower the threshold to 70 kW by 31 December 2029 at the latest (S1, S2, S3).

Last checked: 9 November 2026

Belgium’s three regions, Brussels, Wallonia and Flanders, each set the requirement in their own legislation, with their own dates and details. The official texts are in French or Dutch: we keep their original titles below and summarise them in English.

Check your building in three questions

Region, building type, power: your result appears after the third question.

Quick check, 3 questions

Where is the building?
Is the building mainly non-residential?

Offices, school, shop, hotel, public building: more than half of the floor area.

Heating or cooling output?

Shown on the rating plate of the boiler or the chiller.

Your result appears here after the third question.

Have Elyos check itIndicative, no commitment. Only a site visit can confirm it.

The rules, region by region

The starting threshold is the same everywhere. The dates and the details are not.

Threshold, deadline, mixed-use buildings, legal basis and official source, for Brussels, Wallonia and Flanders
CriterionBrusselsWalloniaFlanders
ThresholdHeating or air conditioning above 290 kWAbove 290 kW useful nominal power, for heating or for air conditioning290 kW, heating and cooling counted separately; hydraulically connected installations are added together
Deadline1 January 2025, for new and existing buildings31 December 202531 December 2025, then 70 kW by 31 December 2029 at the latest
Mixed-use buildingsCovered if non-residential EPB units make up more than 50% of the floor area servedCovered if the non-residential or collective accommodation part (care homes, boarding schools; not blocks of flats) makes up 50% or more of the floor areaCheck case by case
Legal basis‘Arrêté du 21 juin 2018’, Brussels order of 21 June 2018‘Arrêté du Gouvernement wallon du 15 mai 2014’, Walloon Government order, art. 19/3 and annex C4 (French)‘Energiedecreet’, art. 11.1/1.2, and ‘Energiebesluit’, art. 9.4.1, the Flemish energy decree and its implementing order (Dutch)
Official sourceBrussels Environment information sheet, in French (S1)Consolidated text on Wallex, in force from 1 January 2026, in French (S2)Flemish government page, in Dutch (S3)

Brussels

Threshold
Heating or air conditioning above 290 kW
Deadline
1 January 2025, for new and existing buildings
Mixed-use buildings
Covered if non-residential EPB units make up more than 50% of the floor area served
Legal basis
‘Arrêté du 21 juin 2018’, Brussels order of 21 June 2018
Official source
Brussels Environment information sheet, in French (S1)

Wallonia

Threshold
Above 290 kW useful nominal power, for heating or for air conditioning
Deadline
31 December 2025
Mixed-use buildings
Covered if the non-residential or collective accommodation part (care homes, boarding schools; not blocks of flats) makes up 50% or more of the floor area
Legal basis
‘Arrêté du Gouvernement wallon du 15 mai 2014’, Walloon Government order, art. 19/3 and annex C4 (French)
Official source
Consolidated text on Wallex, in force from 1 January 2026, in French (S2)

Flanders

Threshold
290 kW, heating and cooling counted separately; hydraulically connected installations are added together
Deadline
31 December 2025, then 70 kW by 31 December 2029 at the latest
Mixed-use buildings
Check case by case
Legal basis
‘Energiedecreet’, art. 11.1/1.2, and ‘Energiebesluit’, art. 9.4.1, the Flemish energy decree and its implementing order (Dutch)
Official source
Flemish government page, in Dutch (S3)

Last checked: 9 November 2026

What a BACS must do

Having controllers is not enough: the rules ask for specific functions.

Brussels and Wallonia

(same requirements)

  • continuously monitor, log and analyse energy use, and allow it to be adjusted;
  • compare it with reference values, detect losses of efficiency and alert the technical manager;
  • communicate with the building’s other technical systems, whatever their technology or manufacturer.

Wallonia, in addition

  • class B of standard NBN EN 15232-1 when a heat generator is installed or replaced;
  • a report to the owner listing the equipment, its location, its functions and the tests carried out.

Flanders

  • monitor the indoor climate;
  • monitor energy use;
  • enable communication with other systems.

In the plant room, this means meters read by the controls, stored history, alarms that reach the technical manager, and controllers able to exchange data with the rest of the building over BACnet, Modbus or M-Bus.

Who is responsible?

In Flanders, the text names the owner or the holder of a real right over the building. It adds that in a shell-only let (‘casco’), where the tenant fits out the building, the tenant often carries the obligation (S3).

In Brussels and Wallonia, the texts we read do not say who is responsible. It is worth settling the point between owner and occupier before any work starts.

Exemptions

In Flanders, the requirement does not apply where it is ‘technisch, functioneel of economisch niet haalbaar’: not technically, functionally or economically feasible (S3).

In Brussels and Wallonia, we found no exemption in the texts we read.

What about the 70 kW threshold?

Flanders has already set it: the threshold drops to 70 kW by 31 December 2029 at the latest (S3).

Brussels and Wallonia have published no date we could confirm. If your installation is between 70 and 290 kW in Brussels or Wallonia, the rule does not apply to you today, but it is worth keeping an eye on.

Standards: class B in Wallonia

In Wallonia, the order requires class B of NBN EN 15232-1 when a heat generator is installed or replaced (S2). The Brussels information sheet cites no standard (S1).

Not the French BACS decree

Many French-language results on BACS describe the French ‘décret BACS’. Its deadlines do not apply in Belgium: only the regional rules above do.

What to do now

  1. Find the power rating.

    It is on the nameplate of the boiler, heat pump or chiller, and often in the latest service or inspection report.

  2. Take stock of your controls.

    Which brand, which controllers, a supervision system or not, meters read by the controls or not. Photos of the control panels and their labels are enough to start.

  3. Ask for an audit.

    We compare what is in place with the functions your region requires, and tell you what is missing. [to confirm]

Frequently asked questions

Which buildings does the BACS regulation cover in Belgium?

Mainly non-residential buildings (offices, schools, shops, hotels, public buildings) whose heating or air conditioning exceeds 290 kW, in all three regions. In Flanders, the owner or the holder of a real right is responsible. In Brussels and Wallonia, the texts we read do not say.

Which power rating counts?

The heating or air conditioning power shown on the nameplate of the boiler or chiller. In Wallonia, the text refers to useful nominal power. In Flanders, heating and cooling are counted separately, and hydraulically connected installations are added together: two 200 kW boilers on the same circuit count as 400 kW. If in doubt, we can read it on site. [to confirm]

Does a mixed-use building count?

In Brussels, yes if non-residential EPB units make up more than 50% of the floor area served. In Wallonia, yes if the non-residential or collective accommodation part makes up 50% or more of the floor area. Collective accommodation means housing with shared rooms or services, such as a care home or a boarding school; a block of flats does not count. In Flanders, we check case by case.

Is my existing BMS enough?

Not necessarily. A BMS that shows temperatures and alarms does not always provide the required functions: continuous monitoring and logging of energy use, comparison with reference values, detection of efficiency losses, alerts to the technical manager, and communication with other equipment. The meters, the history or the alerts are sometimes missing. We check what yours does and what needs adding.

Have your building checked

Send us the region, the power rating and a few photos of the controls: we will tell you what the rule asks of your building, and what is missing.